The benefits of the nearly completed Enugu-Bamenda Multinational Highway are already being felt by populations on both sides of the Cameroon-Nigeria border.
The 443 km long Bamenda–Enugu corridor comprises the Cameroonian Bamenda-Mamfe-Ekok road sections (203 km), the Nigerian road sections (240 km), the bridge over the Munaya River in Cameroon (100 m) and the border bridge over the Cross River (280 m).
Thanks for sharing the update!
Posted by: Becca | March 11, 2013 at 06:29 AM
Thanks for sharing. Progress is always welcome.
Posted by: Atia | April 15, 2013 at 06:00 AM